Swms review checklist
To be completed by Harbour Town Representative. Use this template to identify and describe specific hazards for high-risk construction work and determine the control measures to be put in place for safe completion of work. SAFE WORK METHOD STATEMENT REVIEW CHECKLIST. On organisation ‘letterhead’, showing the.
Name and Registered Office Address. SWMS REVIEW CHECKLIST. Signed and dated by a. Determines responsibility. All elements of this checklist are considered mandatory.
Each item is answered ‘Yes’ or ‘No’ by selecting the appropriate tick-box. Copies of the completed form are to be retained on the project file. There are specific activities defined as high risk construction work (HRCW). Last Amended: Review Date: 14.
The app is completed in for sections. The actions required to close out the non-conformance must be recorded on the comments page of the checklist. Exclusion zone to be large enough for falling objects.
State what must be done (e.g. a pre-start checklist must be completed) and what must not be done (e.g. do not exceed the load capacity of the unit). Level 1: eliminate – eliminating the need to work at height is the most effective way of protecting workers from the risk of falls. Carry out any work that involves the risk of a fall on the ground. Workers could be exposed to hazards associated with high-risk construction work activities. Have all persons involved in the works been trained in the specific risks and controls detailed?
This checklist can be used to assist with the set up and operation of mobile cranes at construction workplaces. The assessment can be led by a principal contractor, Person Conducting a Business or Undertaking (PCBU), mobile crane operator, dogger or health and safety representative (HSR) and should be done in consultation, coordination and cooperation with everyone involved. Hazards and Impacts Identify the health and safety or environmental Hazards and Impacts associated with each step, and examine each to determine the Risk Rating.
A while ago we started looking into providing customised reports to our schedulers that their techs could complete on-site. NQA Work Activity Category (identified on (c) Describe the specific hazards and risks relating to the NQA Activity (d) Describe the control measure to control the risks and how they are to be implemented ☐ 16. Checklist (Office Use Only)PERCOW section 2. Is there an OHS policy in place, is this displayed in a prominent location and reviewed regularly? Control measures will be monitored throughout works: Spot checks. Next Review Date: 4. Printed copies are considered uncontrolled.
Check that they have suitable height access equipment. Review of control measures to take place as part of annual review. General monitoring of control measures undertaken as part of normal work onsite and at Toolbox meetings. PRE-COMMISSIONING 3. Safety System Testing 3. Valve Position and Instrument Setting 3.