Method statement for concrete coring works pdf

Easy To Use Software. Use a drill unit with a water suppression attachment. Your RAMS In Minutes. Ensure that there is enough water for the amount of work and it flows at the rate needed. Only work from a ladder if a scaffold cannot be set up in work area.


Method statement for concrete coring works pdf

If using a ladder install an expansion anchor in the floor slab that is capable of accommodating fall arrest gear. Employee catching core while on a ladder must wear fall arrest gear and be hocked into anchor bolt in floor slab. The Coring machine is using single phase power. Engineer to mark out egress points for drainage.


Fix internal drainage and concrete surround. Reduce foundation in areas of drainage egress. Slowly lower the bit into the cut so that there is no skidding or lateral movement of the drill bit. The entire circumference of the core bit should penetrate the drilling surface before additional pressure is applied to the handle. Do not force drill bit.


Method statement for concrete coring works pdf

Certain concrete cutting and drilling may involve high-risk construction work , so a safe work method statement must be prepared and followed (see Section ). All risk controls must be reviewed regularly and be adapted to take account of any changes at the workplace. Work tasks: The installation of a chemical damp proof course to walls indicated on plan No. A clamp provided to firmly secure the material during the cutting cycle.


Ready To Get Started? The procedure involves bolting a drill mast to the concrete surface to be core-drilled. The site locations are shown on the plan included on page of this method statement.


Method statement for concrete coring works pdf

All surface defects shall be given ID number for easy reference. Method of Works General Site Practises All site operatives to be given site induction and Method Statement briefings and to attended regular toolbox talks (at least weekly). CITB, CSCS, CCDO certification or equivalent as a minimum requirement for all personnel on site.


Method statement - drilling holes into concrete. Because of the risks associated with drilling holes into concrete , e. Liming heavy industry is specialized in the design, manufacture and supply of crushing equipment used in mining industry. The purpose of this method statement is to explain the proper procedure on how to prepare and cast slab on grade or any horizontal element or member including fixation of steel reinforcement, MEP embedment’s, fixing of shutter etc. During the works , the area will, so far as is reasonably practicable, be kept clean and tidy with clear walkways as appropriate.


KB Author: Ben Lim This document was uploaded by user and they confirmed that they have the permission to share it. TABLE of CONTENT 1. Sequence of Works 8. Concrete Strength 4. The purpose of this Method Statement is to establish the rules to be applied during all the concrete works (including in-situ concrete , precast concrete and concrete repair works ) starting from storage of materials, reinforcement work, formwork, transportation of material, inspection, installation, testing, concrete pouring, concrete curing and concrete repair to ensure that all the concrete works are properly executed in accordance with Project Specifications and applicable standards. This defines the coverage of items in Bill of Quantities and their Method of Measurement.

Comments

Popular posts from this blog

Sap note 1121176

Form 56a

Skype online